Renovated bathroom with a tiled walk-in shower
Property maintenance services

Bathrooms

Bathroom design support, complete renovation and wet-room installation across plumbing, tiling, electrics and decoration.

A bathroom has to work hard: it must stay watertight, ventilate properly and stand up to daily use for years after the tools leave. A1 Maintenance has been carrying out bathroom work since 1989, from straightforward suite replacements through to complete renovations and wet-room conversions, with design support available at the start and one team responsible from strip-out to final decoration.

What the bathroom service includes

Most projects fall into one of three types: a like-for-like refurbishment that updates a tired room, a full renovation that changes the layout or fittings, or a wet-room installation with level access and full waterproofing. Whatever the starting point, the same trades are involved, and A1 provides all of them. Typical tasks include:

  • Strip-out and removal of existing suites, tiling and fittings
  • First-fix plumbing, including relocated pipework, waste runs and drainage falls
  • Tanking and waterproofing for showers and wet rooms
  • Wall and floor tiling, including full-height tiling in wet areas
  • Electrical work such as shower circuits, lighting, extractor ventilation and shaver sockets
  • Installation of baths, walk-in showers, sanitaryware, screens and vanity units
  • Plastering, making-good and final decoration

Design support is available where it is useful, with practical advice on layout options, storage and finishes that suit how the room is actually used. Equally, A1 will work to a layout or specification the customer has already settled on.

How the work is sequenced

Bathrooms leave little room for shortcuts, because most of the critical work ends up hidden behind tiles. A1 sequences each project so that nothing is covered up before it has been checked. Work usually begins with a survey to confirm the layout, services and any access constraints, followed by a written quotation. On site, strip-out and first-fix plumbing and electrics come first, then tanking and waterproofing, which are inspected before any tiling starts. Tiling, second-fix plumbing and sanitaryware follow, with electrical connections, ventilation and decoration completing the room.

Because A1's workforce is directly employed and multi-trade, the plumber, tiler, electrician and decorator work to one programme rather than separate diaries. There are no hand-offs between subcontractors, no waiting for a third party to become available mid-job, and one point of contact for questions throughout. Electrical work is delivered through A1's NICEIC electrical services, which matters in a bathroom, where circuits, zones and ventilation must be installed and tested correctly.

Who the service suits

Most bathroom projects come from homeowners updating a family bathroom, en suite or cloakroom, and the service is planned around occupied homes: floors and hallways are protected, dust is contained where practical, and the programme is agreed before work starts so the household knows when the room will be out of use.

Walk-in showers and wet rooms are a growing part of the workload, often for customers who want level, safer access, whether that means planning ahead for mobility or adapting a bathroom for a family member. The same waterproofing and drainage disciplines apply, with layouts kept practical and comfortable rather than clinical.

A1 also fits bathrooms for private landlords, estate agents and housing associations, where the work often needs to fit between tenancies or run alongside wider refurbishment. In those cases the bathroom can be scoped together with any related repairs, cleaning or decoration so the property is returned to use in one programme rather than several separate visits.

Coverage and next steps

A1 Maintenance is based in Gloucestershire and carries out bathroom work across Gloucestershire, Wiltshire, Oxfordshire, Worcestershire, Bristol and Avon, taking in the towns and villages throughout the region. Every enquiry starts the same way: a conversation about the property and the outcome wanted, a survey to confirm the details, and a clear written quotation covering the trades involved. To get started, book a bathroom consultation and the team will arrange a convenient time to visit.

Service benefits

What this gives the customer

Complete bathroom renovations
Wet rooms, plumbing and tiling
Electrical work and final decoration
Common questions

Bathrooms: your questions answered

How long does a full bathroom renovation take?

Most full bathroom renovations take between one and three weeks on site, depending on the size of the room, whether the layout is changing and how much tiling is involved. A straightforward suite replacement is quicker, while a wet-room conversion with full tanking and floor-to-ceiling tiling sits at the longer end. A1 confirms the expected programme in the written quotation and agrees the start date and sequence with the customer before any strip-out begins.

Can a small bathroom be converted into a wet room?

Yes, in most cases. A wet room needs correct drainage falls, tanking to keep water out of the building fabric and ventilation that copes with an open showering area, and none of that depends on the room being large. Small bathrooms often gain usable space by removing the bath. A1 surveys the floor structure and drainage first, then confirms whether a level-access wet room or a low-profile shower tray is the better option for the room.

Do bathroom fitters handle the plumbing, tiling and electrics, or do I need separate trades?

With A1 you do not need to arrange separate trades. The workforce is directly employed and multi-trade, so plumbing, tiling, plastering, decoration and electrical work are all carried out by one team working to one programme. Electrical work, including shower circuits, lighting and ventilation, is delivered through A1's NICEIC electrical services and tested accordingly, and one point of contact manages the job from strip-out to handover.

How much does a new bathroom cost?

There is no single answer, because the cost depends on the size of the room, whether pipework or drainage is being moved, the extent of tiling and the sanitaryware chosen. Rather than quoting from a standard price list, A1 surveys the room first and provides a written quotation that itemises the work involved, so the price reflects the actual property rather than an estimate made unseen.

Will I be without a bathroom while the work is carried out?

The room itself is out of use from strip-out until the sanitaryware is reconnected, so households with a second bathroom or WC usually manage comfortably. Where the property has only one bathroom, A1 plans the sequence to keep a toilet and basin usable for as much of the programme as possible and agrees the timings in advance, so the household knows exactly when facilities will and will not be available.

Start with the scope

Tell us what the property needs

Include photographs, access constraints and preferred timing where possible. Urgent repairs should be reported by phone as well as through the form.

  1. We review your enquiry A member of the team reads the detail you provide and comes back to you, usually the same working day.
  2. Survey or scoping call Depending on the job, A1 arranges a site visit or agrees the scope over the phone, including access and timing.
  3. Written quotation You receive a clear quotation covering the trades involved and the sequence of work, with one point of contact throughout.

Book a bathroom consultation

Give us enough detail to understand the work. A member of the team will respond using the contact details below.